Vina Robles amphitheater
project overview
This project was located in Paso Robles, CA. at the Vina Robles Winery and Vineyards. This project consisted of the installation of CMU retaining walls and manufactured stone veneer. The Amphitheater façade consisted of the installation of 3,414 units of block and 2,945 square feet of stone veneer. Buildings C-L and the Entry consisted of the installation of 3,800 square feet of stone veneer. Cooper Chase Construction acted as a subcontractor on this project, self-performing all masonry and concrete work.